In the field of signalling - Volume II
- Alkmaar Railway Signaling Australia in collaboration with Pacific Global (pvt) ltd, Sri Lanka was selected as the turnkey sub-contractor for the Design, Installation, Testing, Commissioning, Training and Maintenance of the signaling and level crossing protection system.
- The modern signaling system was the largest and the most important sub-contract in the US$. 289 m. Matara and Beliatta Railway line extension project executed by China Machinery Corporation China. The project commenced in 2018 and was successfully completed in 2019.
- SIL-4 certified Alstom USA made inter locking system.
- XP4 controller modules
- Data communication through 24 core fiber optic cable, USA made ELIXS modules connected.
- MOXA EDS408A modules fixed at each 7 barrier protection cabins. 14 barrier machines provided.
- Fully automatic level crossing protection system under frequency feed track for train motion detection.
- Signalling can be operated from CTC (Centralised traffic control) in Colombo.
- No of main signals 51, No of shunt signals 22, No of gate signals 28. No of point machines 26.
Site Designed and Developed by - PMG CREATIONZ