In the field of railway signalling

  • Replacement of Mechanical Signalling between Wadduwa &  Hikkaduwa (56  Km) on the coastal Railway line of Sri Lanka in collaboration with Vialis Rail Systems B.V. (formerly the signalling arm of Phillips of Nederlands) with an electronically controlled modern signalling system with Central Traffic Control. (Phase 1� Dutch collaboration)

  • Laying of a Fiber Optic Cable from Colombo to Matara (160 km) along the Coastal  Railway Line. (Dutch collaboration)

  • Extension of the already installed Signalling System from Hikkaduwa to Matara (69 km) with a modern Radio & Telecommunication System from Colombo to Matara in collaboration with Vialis Rail Systmes  B.V. (Presently Alkmaar Railway Signalling)  which included communication between the train dispatching center, Railway stations & the locomotives. (Phase II � Dutch collaboration)

  • Rehabilitation of the Electronic Signalling & Telecommuniction System on the Coastal Railway  line in Sri Lanka after the Tsunami disaster of 2004. (Dutch collaboration)











  • Extending the same Alkmaar Railway signalling  (formerly  Vialis) system on the double line track between Wadduwa and  Kalutara North,  upon Sri Lanka  Railway ( SLR ) extending the track . (Dutch Collaboration)

  • Extending the same Alkmaar Railway signalling  system on the double track from Kalutara North and
          Kalutara South upon SLR extending the track. (Dutch Collaboration). Extension of signalling
          system to continue up to Alutgama in the immediate future and up to Galle and Matara in the
          medium term once track is extended.

  • Extension of the Electronic Central Traffic Control System on the Coast line to cover section
          Fort Maradana Loco junction  up to and including station wadduwa. ( Dutch Collaboration)

  • Complete designing, supplying of material, shipping clearing , transport & warehousing,  installation,
          testing & commissioning and warranty maintenance  of the  signaling & telecom system to be
          installed at the newly erected Ahungalle railway station together with Alkmarr Railway signalling Australia.
  • Complete designing, supplying of material, shipping clearing , transport & warehousing,  installation, testing & commissioning and warranty maintenance  of a disaster recovery Central Traffic Control system to be used in contingency situations in collaboration with Alkmarr Railway signalling

  • Supply of High value field signal components such as Point Machines, Barrier Machines, and  1, 2 & 3 aspect signal units. (Continuous & ongoing)

  • Supply of High value Electronic signal system maintenance spares. (Continuous & on going)